74″ of Love – part 2
Finally got the bottom end completed. Got that Andrews AB cam spaced out proper. Cone back on. Tappets and hydro lifters cleaned and neatly back in place. New rings on .060 over pistons. Cylinders torqued back down and I even took a minute to set the timing. For now Im shelving the motor and Ill come back to the top end when I have more free time. I’ve got a couple pairs of heads that I need to have blasted before I reassemble so I’ll just save up the extra scratch and service all of them at the same time. This thing is looking real good and should run even better. Much thanks to Gator and Bear on this one. They both really laid some knowledge on me during the entire rebuild. Learning shovels from the best in the biz is a humbling (and equally rad) experience. More from the chopper blog soon.